  1. Hours to change a die

    Making cars in small batches, as Toyota wanted, only pays if a machine can switch quickly from one part to the next. At Toyota that took between two and eight hours. Taiichi Ohno, who had joined the Toyoda family's spinning firm in 1932 and moved to the car company in 1943, became manager of its machine shops in 1945 and began cutting setup times and lot sizes. On a visit to the United States in 1955 he saw Danly stamping presses built for rapid die changes, and Toyota bought several for its Motomachi plant. Using a method from the American wartime Training Within Industry programme, it cut changeovers to about fifteen minutes by the 1960s.

    Sources: Single-minute exchange of die · Taiichi Ohno

    See this step on the map

  2. Kanban reaches the suppliers

    Kanban cards, which let each process pull only the parts it needed, were first tried in the machining division of Toyota's Honsha plant and adopted at all its plants in 1963. By 1965 they were also used to collect parts from outside suppliers. Toyota told suppliers its methods could improve their own operations, and those willing took them up gradually. Output was also levelled, so that the mix and volume of models did not swing and overload any one process. Western researchers later stressed the supplier side: Toyota worked with a family of firms that held shares in each other and shared information, rather than putting parts out to the lowest bidder.

    Sources: item4.html · The Machine That Changed the World (book)

    See this step on the map

  3. Andon lights and five whys

    The other half of the system was stopping when something went wrong. Machines were fitted to shut down when they detected an abnormality, and andon boards, lit by a worker or by the equipment, showed supervisors where a problem was. Toyota says andon at its Kamigo plant in 1966 completed this approach. At Toyota a first pull of the cord calls a team leader without halting the line; if the fault cannot be fixed, the line stops. The next step was to find the cause. Ohno described asking why five times, each answer leading to the next question, until the root problem appeared. Critics, some inside Toyota, have called the method too shallow.

    Sources: item4.html · Andon (manufacturing) · Five whys

    See this step on the map

  4. Profit at 70 per cent

    The oil crisis of 1973 brought an end to fast growth. Toyota built 2.31 million vehicles in 1973 and 2.11 million in 1974. In January 1975 its president, Eiji Toyoda, told managers to reform structures built for fast expansion, and in April he told a conference of parts suppliers that Toyota could no longer rely on rising volume to solve its problems. The aim was a business that could make a profit running at 70 per cent of capacity. Ohno pressed for what he called people saving rather than labour saving: lines should run with fewer fixed staff, so that work once done by seven could be done by six or five when demand fell.

    Sources: item3.html · item4.html

    See this step on the map

  5. Detroit comes to listen

    The West heard about the system in 1977 through two English-language articles, one of which called it the Ohno system. In 1980 Fujio Cho, later Toyota's president, explained it to American manufacturers at a conference held at Ford's world headquarters in Detroit, and by the mid-1980s Hewlett-Packard, Motorola, General Electric, Deere and Apple had adopted just-in-time methods. Shigeo Shingo, a consultant who had taught industrial engineering courses at Toyota since 1955, did much to spread it. His study of the system appeared in English in 1980, and the American publisher Norman Bodek brought him to lecture. Shingo named Toyota's quick die change the single minute exchange of die, though his claims to have invented it are disputed.

    Sources: Lean manufacturing · Shigeo Shingo · Single-minute exchange of die

    See this step on the map

  6. A new name: lean

    John Krafcik had worked as an engineer at NUMMI, the Toyota and General Motors plant in California, before joining a car industry research programme at the Massachusetts Institute of Technology in 1986. He studied 90 plants in 20 countries, and in a 1988 article he coined the term lean production. His finding was that lean plants were more productive and made better cars, and that the level of plant technology seemed to have little effect on performance. His data underpinned The Machine That Changed the World, published in 1990 by James Womack, Daniel Jones, Daniel Roos and Donna Sammons Carpenter, which made the term known worldwide. Through the 1990s lean steadily replaced just-in-time as the name for the method.

    Sources: John Krafcik · Lean manufacturing · The Machine That Changed the World (book)

    See this step on the map

  7. Hospitals and start-ups

    The ideas then left the car plant. In 2002 Virginia Mason Medical Center in Seattle became the first health care institution to apply the Toyota system throughout, letting staff stop the line when they saw a risk to patient safety; it reported savings of 12 to 15 million dollars over six years. In software, Eric Ries's lean startup method borrowed the aim of cutting waste, testing a minimal product on customers before building more. Toyota itself, which began sharing the system with parts suppliers in the 1990s, launched a programme in 2011 to give its expertise to charities. A New Orleans disaster relief group reported that the time to rebuild a home fell from 12 to 18 weeks to six.

    Sources: Virginia Mason Medical Center · Lean startup · Toyota Production System

    See this step on the map

  8. The limits of lean

    The method has costs. Working with little margin for error is linked to higher stress for employees, and critics compare lean to the scientific management of the nineteenth century. Holding little stock also leaves firms exposed when supplies stop: during the Covid-19 pandemic, quarantine rules interrupted trade while stockpiles were thin, prompting calls for larger reserves and more varied suppliers. Toyota's own success raised a related worry. Its tightly consolidated supply chain had helped make it the world's biggest carmaker, but the safety crisis of 2010 made rivals that had copied the model wary of similar recalls, and James Womack had warned Toyota about the risks of relying on single outside suppliers.

    Sources: Lean manufacturing