Story · Events
Fukushima and TEPCO
Japan's biggest utility, a GE-designed plant, a tsunami and a state rescue

Built to General Electric's design
Tokyo Electric Power, or TEPCO, was one of nine regional power monopolies created when Japan's wartime electricity system was privatised in 1951. Fukushima Daiichi, its first nuclear plant, was designed, built and run together with General Electric, and its first unit began commercial operation in March 1971. All six boiling water reactors were GE designs; GE supplied three of them, Toshiba two and Hitachi one, with Ebasco Services on the architecture and Kajima doing the construction. TEPCO cut the coastal bluff by 25 metres, partly to sit the reactors on bedrock and partly to make pumping seawater cheaper, and placed the backup generators in basements, as GE's plans specified.
Sources: Tokyo Electric Power Company · Fukushima Daiichi Nuclear Power Plant
Warnings on file
TEPCO's record was already uneven. From 2002 its reactors were shut for safety checks after a scandal over falsified data, and in 2007 it admitted further unreported incidents going back to 1978. Inside the company, studies in 2006 and 2008 looked at tsunamis taller than the 5.7 metres the company officially expected; the 2006 work found that a 13.5 metre wave would cut all power. Protection was estimated to cost about 25 million dollars, but nothing was done, because the studies were treated as training for junior staff. On 28 February 2011 TEPCO told regulators it had filed false inspection and repair reports.
Sources: Tokyo Electric Power Company · Fukushima Daiichi Nuclear Power Plant
11 March 2011
When the Tohoku earthquake struck, the three working reactors shut down automatically, but the tsunami that followed flooded the site and knocked out the emergency generators that ran the cooling pumps. Three reactors melted down, and the accident was rated at level 7, the top of the international scale. TEPCO was criticised for its handling: seawater was used for cooling only after Prime Minister Naoto Kan ordered it following an explosion. About 50,000 households were displaced. With the plant and its sister station offline, TEPCO imposed the first rolling blackouts in its history, cutting power to 700,000 households for three hours on 15 March.
Sources: Tokyo Electric Power Company · Discharge of radioactive water of the Fukushima Daiichi Nuclear Power Plant
The state takes control
TEPCO's shares lost almost all their value. Its biggest holders, the life insurers Dai-ichi Life and Nippon Life, sold out, and in April 2012 the Tokyo Metropolitan Government briefly became its largest shareholder. Staff and directors took deep pay cuts. On 31 July 2012 a government-backed body, the Nuclear Damage Liability Facilitation Fund, injected 1 trillion yen of capital, taking 50.11 per cent of the voting rights with the option to go to 88.69 per cent. By February 2016 it had received at least 5.76 trillion yen of state support to pay compensation and keep running.
Sources: Tokyo Electric Power Company
A forty-year clean-up
The bill keeps growing. In May 2012 the disaster's cost was put at about 100 billion dollars. A later estimate for decommissioning and decontamination, including compensation to victims, reached 195 billion dollars, of which 71 billion is for dismantling the reactors. TEPCO is to carry 143 billion dollars of that, the Ministry of Finance 17 billion, and Japan's other power companies also contribute. Decommissioning is expected to take 30 to 40 years. The three damaged reactors hold about 880 tonnes of melted fuel, and the start of full-scale removal has slipped to fiscal 2037 at the earliest, making the target of finishing by 2051 all but impossible.
Sources: Fukushima Daiichi Nuclear Power Plant · Tokyo Electric Power Company · www.nippon.com
What the courts decided
In 2016 the former chairman Tsunehisa Katsumata and two former vice presidents were charged with negligence causing death and injury; the Tokyo District Court acquitted them in September 2019. Civil courts went further against the company. In March 2022 the Supreme Court upheld an order for TEPCO to pay 1.4 billion yen to about 3,700 people, though in June it cleared the government of liability. In July 2022, in a case brought by shareholders, the Tokyo District Court ordered four former executives to pay TEPCO 13 trillion yen. The Tokyo High Court overturned that in June 2025, finding they could not reasonably have foreseen so large a tsunami.
Sources: Fukushima nuclear accident · www.nippon.com · www.jurist.org
Releasing the water
Cooling water, groundwater and rain that touch the melted fuel become contaminated, and TEPCO stored more than a million tonnes of it in tanks after treating it to remove most radioactive elements except tritium. With the cabinet's approval, it began releasing diluted water into the Pacific on 24 August 2023, a process that could take more than 30 years. The International Atomic Energy Agency found the plan consistent with international safety standards. China, Hong Kong and Macau banned seafood from some or all of Japan, and a consumer boycott in China knocked 14 per cent off Shiseido's shares in a day. China partly lifted its seafood ban in June 2025, then suspended imports again that November during a diplomatic row.
Sources: Discharge of radioactive water of the Fukushima Daiichi Nuclear Power Plant · 2025 in Japan · fortune.com · china-halts-japanese-seafood-imports-amid-diplomatic-row-102384739.html